List of Projects Starting with Alphabet 't'

Total Count of Projects: 139
< Previos1234567Next >

Address: Conlin Road East & Harmony Road North, Oshawa, ON

Approximately occupancy date:

Building size:

Builder: Medallion Corporation

Project Description:

Stella Phase 2: A star is born at the SouthSide Community in South Brampton. Rising 21 storeys at the prime location of Steeles Avenue West and Hurontario, Stella is a 5-min walk to everything that matters. Sheridan College, Brampton Gateway Bus Terminal, future Hurontario LRT, Real Canadian Super Store, and much more.

 

Address: 33 Parliament St Toronto, ON M5A 2Y2

Approximately occupancy date:Winter/Spring 2025

Building size: 32

Builder: Graywood Developments

Project Description:

The Goode Condos is a new condo development by Graywood Developments Ltd currently in preconstruction at 33 Parliament Street, Toronto. The development is scheduled for completion in 2025. The Goode Condos has a total of 540 units. Sizes range from 263 to 1156 square feet.

 

Address: 180 Front St East Toronto, ON M5A 1E7

Approximately occupancy date:Winter/Spring 2025

Building size: 45

Builder: Menkes Developments Ltd. and Core Development Group

Project Description:

The Whitfield is a new condo development by Menkes Developments Ltd. and Core Development Group currently in preconstruction at 180 Front Street East, Toronto. The development is scheduled for completion in 2025. The Whitfield has a total of 470 units.

 

Address: 1005 Dundas St East Oakville, ON L6H 7E8

Approximately occupancy date:

Building size: 8

Builder: WP Development Inc and GCL Builds

Project Description:

The Wilmot is a new condo development by WP Development Inc and GCL Builds currently in preconstruction at 1005 Dundas Street East, Oakville. The Wilmot has a total of 380 units.

 

Address: 2500 Yonge St Toronto, ON M4P 2H7

Approximately occupancy date:

Building size:

Builder: Madison Group and Westdale Properties

Project Description:

The Capitol Residences is a new condo development by Madison Group and Westdale Properties currently in preconstruction at 2500 Yonge Street, Toronto. The Capitol Residences has a total of 145 units. Sizes range up to 3000 square feet.

 

Address: 121 Mary St Creemore, ON L0M 1G0

Approximately occupancy date:

Building size: 4

Builder: MDM Developments

Project Description:

The Brix is a new condo development by MDM Developments currently in preconstruction at 121 Mary Street, Creemore.

 

Address: 101 Nipissing Rd. Milton, ON L9T 1R3

Approximately occupancy date:2025

Building size: 19

Builder: Fernbrook Homes

Project Description:

The Millhouse Condominiums is a new condo development currently in pre-construction by Fernbrook Homes. This development will be constructed in three phases, starting with a 17-story tower containing 228 residential units, followed by a 19-story tower containing 232 units and a 15-story tower containing 217 units, for a total of 677 units. Coming soon to Ontario St S & Main St E in Milton.

 

Address: 840 Dupont St Toronto, ON M6G 1Z8

Approximately occupancy date:Spring 2025

Building size: 9

Builder: Primont Homes

Project Description:

The Dupont is a new condo development by Tridel currently in preconstruction at 840 Dupont Street, Toronto. The Dupont has a total of 349 units.

 

Address: 1614 Charles St Whitby, ON L1N 1B9

Approximately occupancy date:

Building size: 18

Builder: Carttera Private Equities

Project Description:

The Landing Condos at Whitby Harbour is a new condo development by Carttera Private Equities currently in preconstruction at 1614 Charles Street, Whitby.

 

Address: 2430 Old Bronte Rd Oakville, ON L6M 4J2

Approximately occupancy date:Summer 2023

Building size: 8

Builder: Brixen Developments Inc. and Queensgate Homes

Project Description:

The Bronte is a new condo development by Brixen Developments Inc. and Queensgate Homes currently in preconstruction at 2430 Old Bronte Road, Oakville. The development is scheduled for completion in 2023. The Bronte has a total of 129 units. Sizes range from 540 to 860 square feet..

 

Address: 831 Glencairn Ave North York, ON M6B 3J4

Approximately occupancy date:2023

Building size: 11

Builder: Chestnut Hill Developments

Project Description:

The Dylan Condominiums is a new condo development by Chestnut Hill Developments currently in preconstruction at 831 Glencairn Avenue, Toronto. The Dylan Condominiums has a total of 222 units.

 

Address: 511 Kingston Road , Toronto , M4L 1V5

Approximately occupancy date:2021

Building size: 8

Builder: Condoman Developments Inc.

Project Description:

The View Beach Residences is a new condo and townhouse development by Condoman Developments Inc. currently in preconstruction at 511 Kingston Road, Toronto.

 

Address: 120 Eagle Rock Way, Maple, ON L6A 1P9

Approximately occupancy date:2022

Building size: 16

Builder: Pemberton Group

Project Description:

The Mackenzie Condos is a new condo development by Pemberton Group currently in preconstruction at Eagle Rock Way, Vaughan.

 

Address: 1030 Danforth Ave, Toronto, ON M4J 1M2,

Approximately occupancy date:2021

Building size: 8

Builder: Condoman Developments Inc.

Project Description:

Theo Condos is a development by Condoman Developments Inc. located at 1030 Danforth Avenue, Toronto. The building features 54 condo units at 8-storeys tall.

 

Address: 1421 Yonge St, Toronto, ON M4T 1Y7

Approximately occupancy date:2022

Building size: 34

Builder: Great Gulf Homes and Terracap

Project Description:

The Clair Residences is a pre-construction condominium development by Great Gulf in Midtown Toronto. This new project is located at 1421 Yonge street Street and has an occupancy date of February 2023.

 

Address: 2 Beverley Glen Blvd Thornhill, ON

Approximately occupancy date:Summer 2023

Building size: 25

Builder: The Daniels Corporation and Baif Developments

Project Description:

The Thornhill is a new condo development by The Daniels Corporation and Baif Developments currently in preconstruction at 2 Beverley Glen Boulevard, Vaughan. The development is scheduled for completion in 2023. The Thornhill has a total of 308 units. Sizes range from 533 to 1488 square feet.

 

Address: 859 Eglinton Ave East, East York, ON M4G 2L5

Approximately occupancy date:Winter/Spring 2023

Building size: 14

Builder: CentreCourt Developments

Project Description:

The Forest Hill Condominiums is a new condo development by CentreCourt currently in preconstruction at 859 Eglinton Avenue West, Toronto. The development is scheduled for completion in 2023. The Forest Hill Condominiums has a total of 350 units. Sizes range from 350 to 1150 square feet.

 

Address: 2180 Lawrence Ave East Scarborough, ON M1P 2P8

Approximately occupancy date:2023

Building size: 21

Builder: G Group Development Corp

Project Description:

The Borough Condos - Tower A is a new condo development by G Group Development Corp. currently in preconstruction at 2180 Lawrence Avenue East, Toronto. The development is scheduled for completion in 2023. The Borough Condos - Tower A has a total of 282 units.

 

Address: 89 Church St Toronto, ON M5C 2G3

Approximately occupancy date:

Building size: 47

Builder: Minto Group Inc.

Project Description:

The Saint Condos is a New Condo development by Minto located at Church St & Adelaide St, Toronto.

 

Address: 2450 Old Bronte Rd Oakville, ON L6M 4J2

Approximately occupancy date:

Building size: 8

Builder: Zancor Homes

Project Description:

The Branch Condos is a new condo development by Zancor Homes currently in preconstruction at 2450 Old Bronte Road, Oakville. Eight storeys of one, two and three bedroom suites from the high $300s, coming soon to Old Bronte Road and Dundas Street West.

 

< Previos1234567Next >
ALL
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
Please note that content and information contained in this website is for demonstration purposes only and this website is trial website or test website and it can not be used for marketing purposes.